A renovation usually starts with one job and finds three more. A wall comes out and the lintel above it is not what anyone expected, or a ceiling comes down and the roof above it has been letting water in for years. We would rather find that at the quote than halfway through, so we look at the whole house, roof included, before we price it.
A lot of the housing across our patch is older than it looks, from Marsh cottages to post war estates, and an old house has to be renovated as one. Materials that suit a modern cavity wall can trap damp in a solid one, and the right repair depends on how the house was built in the first place.
The order matters more than anything. The house is made sound and watertight first, then the structure, then the services, then the finishes, because every stage that is done out of turn gets undone by the next one.
Before you start
What needs approval in a renovation?
Work that only affects the inside of a house is not development, so it does not need planning permission. A listed building is the exception, because listed building consent covers the inside as well as the outside.
Building regulations are a different matter. Taking out a load bearing wall is a material alteration and needs approval. A replacement window, frame and all, has to comply too, which an installer registered with a competent person scheme such as FENSA can certify themselves. Electrical work has to be certified where it adds a new circuit, replaces the consumer unit or is in a room with a bath or shower.
Renovating more than half of a wall, floor or roof, or more than a quarter of the whole outside of the house, brings in the insulation standards, so the part being renovated has to be upgraded where that is technically and economically sensible. Re roofing is where most people meet this rule first.